Due to the decline in gas tax revenue during the COVID-19 pandemic restrictions, NCDOT’s cash reserve balance has fallen below the statutory required minimum balance of $293 million. This has forced the suspension of most projects statewide, since with a cash floor balance below the statutory minimum, NCDOT is unable to enter into any new construction, engineering, or repair contracts, nor negotiate right-of-way costs. In the Wilmington Region, the following projects have been granted permission to continue preliminary engineering (PE): R-3300A&B (Hampstead Bypass), U-5734 (South Front Street Widening), P-5740 (Wilmington Beltline Rail Improvements), I-6039 (I-40 Resurfacing).
A copy of a press release, dated May 4th, 2020, outlining what NCDOT can and cannot do during the time the cash balance is below the statutory minimum, as well as the agency’s intended next steps, can be found here:
Project: South 17th Street Multi-Use Path (EB-5600) Project Type: BikePed Projects |
Status: Construction FY2022 |
This project will construct a multi-use path along South 17th Street from Hospital Plaza Drive to Independence Boulevard. |
Due to the decline in gas tax revenue during the COVID-19 pandemic restrictions, NCDOT’s cash reserve balance has fallen below the statutory required minimum balance of $293 million. This has forced the suspension of most projects statewide, since with a cash floor balance below the statutory minimum, NCDOT is unable to enter into any new construction, engineering, or repair contracts, nor negotiate right-of-way costs. This suspension of projects extends to the WMPO’s STBGP and TASA projects since NCDOT is responsible for entering into contracts for these projects. Locally administered projects not currently committed to a phase of work, have been suspended until further notice. If the project is currently in a phase of work (PE, ROW, or Construction) with funds authorized and is underway with a contract, or a construction contract has been let, as of April 30th, then permission may be made to continue with that phase of work. Efforts are being made to bring the phase of work to full completion or at least to a logical stopping point. No further phases will be authorized, nor will additional funding within a currently authorized phase be added, until the NCDOT’s financial position improves.
Project: 21st Street/Market Street HAWK Signal (EB-6028) Project Type: BikePed Projects |
Status: On hold until additional funding is available and approved |
This project includes the design and construction of a HAWK signal at the pedestrian crossing at Market Street and 21st Street. |
Project: 5th Avenue & Wooster Street Intersection Improvements (U-5527B) Project Type: BikePed Projects |
Status: Complete |
This project consisted of the construction of high visibility crosswalks, curb ramps, and pedestrian activated signals on 5th Avenue at the Dawson Street and Wooster Street intersections. |
|
Project Files: Map of Proposed Project |
Project: Belville Elementary MUP (EB-6026) Project Type: BikePed Projects |
Status: Design |
This project consists of the construction of an 8′ wide multi-use path located along NC133 connecting the north and south entrances of the Hawks Water development to Belville Elementary School. |
Project: Clarendon Avenue MUP (EB-6029) Project Type: BikePed Projects |
Status: The Town is evaluating the scope for the project |
This project includes the construction of a multi-use path from 4th Street to Dow Road in Carolina Beach. |
Project: Coral Drive Sidewalks (U-5534S) Project Type: BikePed Projects |
Status: Anticipated let date FY2021 |
This project includes the construction of approximately 950 linear feet of 5′ wide sidewalk along Coral Drive adjacent to Wrightsville Beach Elementary. |
Project: Hinton Avenue MUP (U-5534H) Project Type: BikePed Projects |
Status: Design |
The construction of a 8′ wide multi-use path along Hinton Avenue from Park Avenue to Greenville Avenue. |
|
Project Files: Map of Proposed Project |
Project: Hooker Road MUP (U-5534G) Project Type: BikePed Projects |
Status: Design |
The construction of a 8′ wide multi-use path along Hooker Road from Wrightsville Avenue to Mallard Drive/Rose Avenue intersection. |
|
Project Files: Map of Proposed Project |
Project: Leland Middle School Sidewalk (U-5534K) Project Type: BikePed Projects |
Status: Construction bids under review |
This project includes the construction of a 5′ wide concrete sidewalk adjacent to Old Fayetteville Road from Ricefield Branch Road to the US74/76 overpass after Glendale Drive with connections to Leland Middle School and the surrounding neighborhoods. |
|
Project Files: Map of Proposed Project |
Project: Middle Sound Greenway Extension (U-5527C) Project Type: BikePed Projects |
Status: Under Construction |
This project consists of the construction of a multi-use path along Middle Sound Loop Road from Oyster Lane to the Middle Sound Village property line. |
|
Project Files: Map of Proposed Project |
Project: Middle Sound Greenway Ogden Park Connection (EB-6027) Project Type: BikePed Projects |
Status: Design |
This project includes the design of a multi-use path along Middle Sound Loop Road, Lendire Road, and Ogden Business Lane, connecting the Middle Sound Greenway to Ogden Park. |
Project: Navassa Park MUP (U-5534U) Project Type: BikePed Projects |
Status: Design |
This project will construct bike lanes on both sides of Brooklyn Street, a multi-use path connecting Brooklyn Street to Navassa Park, and a multi-use path through Navassa Park forming a loop within the park. |
Project: Old Fayetteville Loop Road Pedestrian Loop (U-5534J) Project Type: BikePed Projects |
Status: Construction bids under review |
This project includes the construction of sidewalks in three locations in the Town of Leland: (1) 8′ wide concrete sidewalk along Village Road from Town Hall Drive to the apartment complex (includes widening the existing 5′ sidewalk in front of the apartment complex to 8′); (2) 6′ wide sidewalk along Town Hall Drive from Village Road NE to the existing sidewalk by the new Town Hall; and (3) 5′ wide sidewalk along Old Fayetteville Road from the existing sidewalk in front of the apartment complex to Village Road NE. |
|
Project Files: Map of Proposed Project |
Project: Old Fayetteville/Village Road MUP (U-5534D) Project Type: BikePed Projects |
Status: Under Construction |
The project is for the design and construction of a ten foot (10′) wide multi-use path, separate but adjacent to Old Fayetteville Road, beginning at or around the corner of the Leland Town Hall Campus and ending at the driveway of the North Brunswick High School. |
|
Project Files: Map of Proposed Project |
Project: Park Avenue MUP (U-5534F) Project Type: BikePed Projects |
Status: Anticipated let date FY2021 |
The project is for the construction of a multi-use trail on Park Avenue between Audubon Drive and Kerr Avenue. |
|
Project Files: Map of Proposed Project |
Project: Rice Hope MUP (EB-6025) Project Type: BikePed Projects |
Status: Design |
This project consists of the construction of an 8′ wide multi-use path located along the western side of NC133 between Morecamble Boulevard and Rice Hope Run. |
Project: South College Road/Holly Tree Road Crosswalks (U-5534Q) Project Type: BikePed Projects |
Status: On hold until NCDOT’s College Road resurfacing project occurs |
This project consists of the installation of sidewalk, ADA ramps, curb and gutter, markings, and traffic signal revisions required for actuated pedestrian crossings at the intersection of NC132 (S. College Road) and Holly Tree Road in Wilmington. |
|
Project Files: Map of Proposed Project |
Project: St. Joseph Street/Lewis Drive Bicycle Lanes (EB-6039) Project Type: BikePed Projects |
Status: Pending agreement request |
This project includes the construction of bicycle lanes along St. Joseph Street and Lewis Drive from Lake Park Boulevard to Access Road in Carolina Beach. |
Project: Village Road MUP Extension (U-5534I) Project Type: BikePed Projects |
Status: Construction bids under review |
This project includes the construction of an 8-foot wide asphalt multi-use path routed across Perry Avenue, behind the library, out to Village Road, and along Village Road to the western edge of the First Baptist Church property before the Sturgeon Creek Bridge. |
|
Project Files: Map of Proposed Project |
Project: 2014 Transportation Bond Initiative Project Type: BikePed Projects |
Status: See Link Below |
City of Wilmington’s 2014 Transportation Bond Projects
|