Project: South 17th Street Multi-Use Path (EB-5600) Project Type: BikePed Projects |
Status: Construction FY2022 |
This project will construct a multi-use path along South 17th Street from Hospital Plaza Drive to Independence Boulevard. |
Project: 21st Street/Market Street HAWK Signal (EB-6028) Project Type: BikePed Projects |
Status: Design under Review |
This project includes the design and construction of a HAWK signal at the pedestrian crossing at Market Street and 21st Street. |
Project: 5th Avenue & Wooster Street Intersection Improvements (U-5527B) Project Type: BikePed Projects |
Status: Complete |
This project consisted of the construction of high visibility crosswalks, curb ramps, and pedestrian activated signals on 5th Avenue at the Dawson Street and Wooster Street intersections. |
|
Project Files: Map of Proposed Project |
Project: Belville Elementary MUP (EB-6026) Project Type: BikePed Projects |
Status: Design |
This project consists of the construction of an 8′ wide multi-use path located along NC133 connecting the north and south entrances of the Hawks Water development to Belville Elementary School. |
Project: Clarendon Avenue MUP (EB-6029) Project Type: BikePed Projects |
Status: The Town is evaluating the scope for the project; Design modifications requested |
This project includes the construction of a multi-use path from 4th Street to Dow Road in Carolina Beach. |
Project: Coral Drive Sidewalks (U-5534S) Project Type: BikePed Projects |
Status: Anticipated let date FY2021 |
This project includes the construction of approximately 950 linear feet of 5′ wide sidewalk along Coral Drive adjacent to Wrightsville Beach Elementary. |
Project: Hinton Avenue MUP (U-5534H) Project Type: BikePed Projects |
Status: Anticipated ROW FY2022, Construction FY2023-FY2024 |
The construction of a 8′ wide multi-use path along Hinton Avenue from Park Avenue to Greenville Avenue. |
|
Project Files: Map of Proposed Project |
Project: Hooker Road MUP (U-5534G) Project Type: BikePed Projects |
Status: Anticipated ROW FY2022, Construction FY2023-FY2024 |
The construction of a 8′ wide multi-use path along Hooker Road from Wrightsville Avenue to Mallard Drive/Rose Avenue intersection. |
|
Project Files: Map of Proposed Project |
Project: Leland Middle School Sidewalk (U-5534K) Project Type: BikePed Projects |
Status: Project on hold pending resolution of contracting issues with the consultant; Completion extended to June 30, 2022 |
This project includes the construction of a 5′ wide concrete sidewalk adjacent to Old Fayetteville Road from Ricefield Branch Road to the US74/76 overpass after Glendale Drive with connections to Leland Middle School and the surrounding neighborhoods. |
|
Project Files: Map of Proposed Project |
Project: Middle Sound Greenway Extension (U-5527C) Project Type: BikePed Projects |
Status: Under Construction |
This project consists of the construction of a multi-use path along Middle Sound Loop Road from Oyster Lane to the Middle Sound Village property line. |
|
Project Files: Map of Proposed Project |
Project: Middle Sound Greenway Ogden Park Connection (EB-6027) Project Type: BikePed Projects |
Status: Design, ROW Acquisition |
This project includes the design of a multi-use path along Middle Sound Loop Road, Lendire Road, and Ogden Business Lane, connecting the Middle Sound Greenway to Ogden Park. |
Project: Navassa Park MUP (U-5534U) Project Type: BikePed Projects |
Status: ROW Authorization Approved; Construction Fund FY2022 |
This project will construct bike lanes on both sides of Brooklyn Street, a multi-use path connecting Brooklyn Street to Navassa Park, and a multi-use path through Navassa Park forming a loop within the park. |
Project: Old Fayetteville Loop Road Pedestrian Loop (U-5534J) Project Type: BikePed Projects |
Status: Project on hold pending resolution of contracting issues with the consultant; Completion extended to June 30, 2022 |
This project includes the construction of sidewalks in three locations in the Town of Leland: (1) 8′ wide concrete sidewalk along Village Road from Town Hall Drive to the apartment complex (includes widening the existing 5′ sidewalk in front of the apartment complex to 8′); (2) 6′ wide sidewalk along Town Hall Drive from Village Road NE to the existing sidewalk by the new Town Hall; and (3) 5′ wide sidewalk along Old Fayetteville Road from the existing sidewalk in front of the apartment complex to Village Road NE. |
|
Project Files: Map of Proposed Project |
Project: Old Fayetteville/Village Road MUP (U-5534D) Project Type: BikePed Projects |
Status: Construction Complete, Project Completion Extended to December 2022 |
The project is for the design and construction of a ten foot (10′) wide multi-use path, separate but adjacent to Old Fayetteville Road, beginning at or around the corner of the Leland Town Hall Campus and ending at the driveway of the North Brunswick High School. |
|
Project Files: Map of Proposed Project |
Project: Park Avenue MUP – Phase II (U-5534F) Project Type: BikePed Projects |
Status: ROW Anticipated FY2022, Construction FY2023-FY2024 |
This project is for the design and construction of an off-road multi-use path between Audubon Boulevard and Kerr Avenue. |
|
Project Files: Map of Proposed Project |
Project: Rice Hope MUP (EB-6025) Project Type: BikePed Projects |
Status: Design, FY22 LET Anticipated |
This project consists of the construction of an 8′ wide multi-use path located along the western side of NC133 between Morecamble Boulevard and Rice Hope Run. |
Project: South College Road/Holly Tree Road Crosswalks (U-5534Q) Project Type: BikePed Projects |
Status: On hold until NCDOT’s College Road resurfacing project occurs |
This project consists of the installation of sidewalk, ADA ramps, curb and gutter, markings, and traffic signal revisions required for actuated pedestrian crossings at the intersection of NC132 (S. College Road) and Holly Tree Road in Wilmington. |
|
Project Files: Map of Proposed Project |
Project: St. Joseph Street/Lewis Drive Bicycle Lanes (EB-6039) Project Type: BikePed Projects |
Status: Design |
This project includes the construction of bicycle lanes along St. Joseph Street and Lewis Drive from Lake Park Boulevard to Access Road in Carolina Beach. |
Project: Village Road MUP Extension (U-5534I) Project Type: BikePed Projects |
Status: Project on hold pending resolution of contracting issues with the consultant; Completion extended to June 30, 2022 |
The construction of a 8-foot-wide concrete path from the connection at the Brunswick Center in Leland across the front of the library property, down Village Road, ending on the western edge of the First Baptist Church property before the Sturgeon Creek Bridge. |
|
Project Files: Map of Proposed Project |
Project: 2014 Transportation Bond Initiative Project Type: BikePed Projects |
Status: See Link Below |
City of Wilmington’s 2014 Transportation Bond Projects
|