Old Fayetteville/Village Road MUP (U-5534D)

The project is for the design and construction of a ten foot (10′) wide multi-use path, separate but adjacent to Old Fayetteville Road, beginning at or around the corner of the Leland Town Hall Campus and ending at the driveway of the North Brunswick High School.