This project consisted of the construction of a bus pull-out and loading area along Shipyard Boulevard, including the installation of sidewalk from Rutledge Drive to Vance Street, in Wilmington.
This project consisted of the construction of a bus pull-out and loading area along Shipyard Boulevard, including the installation of sidewalk from Rutledge Drive to Vance Street, in Wilmington.