

Project: ILM Extend Runway 6-24 Phase 1 (AV-5730) Project Type: Airport Projects |
Status: On Hold |
Phase 1 of several project phases will consist of preliminary engineering, environmental review and design. The final phase of the project will improve runway 6-24 capabilities. |
Project: ILM Pipe Ditches in FBO #2 Area (AV-5713) Project Type: Airport Projects |
Status: Environmental & Design |
The project consists of stormwater infrastructure improvements, which will allow future development consistent with ILM’s General Aviation Master Plan. |
Project: ILM Rehab GA Apron North (AV-5702) Project Type: Airport Projects |
Status: Under Construction |
The project is a rehabilitation and improvements to the seventy plus year old concrete aircraft parking apron in accordance with ILM’s General Aviation Master Plan. |
Project: ILM Upgrade Airfield Lighting Vault (AV-5704) Project Type: Airport Projects |
Status: On Hold |
This project will upgrade the airfield lighting generator along with other lighting mechanical systems. |