This project consists of the installation of sidewalk, ADA ramps, curb and gutter, markings, and traffic signal revisions required for actuated pedestrian crossings at the intersection of NC132 (S. College Road) and Holly Tree Road in Wilmington.
This project consists of the installation of sidewalk, ADA ramps, curb and gutter, markings, and traffic signal revisions required for actuated pedestrian crossings at the intersection of NC132 (S. College Road) and Holly Tree Road in Wilmington.